Estimating And Costing Mcqs
Q.1: Pick up the correct statement from the following?1
A. The bent up bars at a support resist the negative bending moment@
B. The bent up bars at a support resist the sharing force6
C. The bending of bars near supports is generally at 456
D. All the above
Q.2: Pick up the correct statement from the following?1
A. In a gully trap, a water seal of 6 to 7.5 cm is provided8
B. The gully trap collects waste water from the kitchen, sink, wash basins, etc.M
C. The gully trap disconnects the sullage drain from the main drainage systemJ
D. The grating provided over gully traps is 23 cm square5
Q.3: Pick up the correct statement from the following?1
A. All pipes and fittings are classified according to their diametersB
B. The diameter of the pipes is the nominal diameter of internal boreB
C. All pipes are measured along the centre line of the pipes in metresC
D. All the above
Q.4: S: 1 and length is______________?!
A. d d s
B. d2 ( ds)2]
C. L.D 1 + s2)
D. 2 L.D 1 + s 2)
Q.5: The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2:1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by Prismoidal formula, is____________________?E
A. 3250 m3
B. 3225 m3
C. 3275 m3
D. 3300 m3
Q.6: Pick up the item whose weight is added to the weight of respective item, is________________?\
A. Cleats
B. Brackets
C. Bolts
D. All the above
Q.7: The expected out turn of brick work in cement mortar in foundation and plinth per mason per day, is ________________?u
A. 1.00 m3
B. 1.25 m3
C. 1.50 m3
D. 1.75 m3
Q.8: The height of the sink of wash basin above floor level is kept____________________?S
A. 60 cm
B. 70 cm
C. 75 cm to 80 cm
D. 80 cm
Q.9: For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cement required, is___________________?{
A. 0.200 m3
B. 0.247 m3
C. 0.274 m3
D. 0.295 m3
Q.10: For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is_______________?n
A. 0.90 m3
B. 0.94 m3
C. 0.98 m3
D. 1.00 m3

Related Mcqs

All Subject Mcqs